< Back to portfolio





Workplace 

Pernod Ricard

Chiswick Park, London

  • Client: Pernod Ricard
  • Architect: HLW
  • Scope: Fit Out
  • Major fit out
  • 2 storey hanging staircase
  • End user client

Pernod Ricard recently acquired 85,000 sq ft of office space at Building 7,Chiswick Park. Parmarbrook were chosen to work alongside HLW to create a progressive, forward thinking, creative space that benefits the 3 affiliates of Pernod Ricard London.

The 2 storey hanging staircase was constructed through a new set of slab openings in the post tensioned slab. The treads were constructed in 6mm folded steel plate with ultra thin 50x100mm stringers, welded and ground down to create seamless connections. The hanging rods were fitted with hidden turnbuckle connections to ensure even balance across the structure, all suspended from a hidden steel subframe integrated into the service distribution above the ceiling.

Images ©