Project Fish comprises the refurbishment and alteration of the data floor of an existing multi-storey data centre.
The design required a check of the existing slabs to support the proposed HAC layout along with supporting containment fixings to support the service installation. There was also a requirement to add more vertical service voids through the floors for proposed risers.