Kao Data KLON 06
Parmarbrook was appointed by Kao Data to carry out structural design and fit out to one of their existing data centres. Works include 4 new technical data halls that consist of 2 No 4MW suites, 1 No 2.5MW and 1 No 1.25MW suite. All the new infrastructure will be independent of existing infrastructure. Our role […]
Project Fish
Project Fish comprises the refurbishment and alteration of the data floor of an existing multi-storey data centre. The design required a check of the existing slabs to support the proposed HAC layout along with supporting containment fixings to support the service installation. There was also a requirement to add more vertical service voids through the […]
Global Switch Data Centre
Parmarbrook carried out the structural engineering design work associated with the refurbishment of two floors of the existing Global Switch data centre – a specialist technical facility that accommodates extensive clean rooms and the associated support infrastructure. Parmarbrook had the challenge of designing the installation of the robust mechanical service provision and balancing the load […]